Acauã Wind Complex

Cesi and Gravier

Inauguration

  • CESI: 12/12/2017
  • Gravier: 30/12/2022

Installed Power

  • CESI: 98.7 MW
  • Gravier: 71.4 MW

Wind turbines

  • CESI: 47
  • Gravier: 17

Feeding Capacity

Supply of about

  • CESI: 47
  • Gravier: 17
households with the consumption pattern of the Northeast

The Acauã Wind Complex, inaugurated on May 21, 2024, is composed of the Acauã I, II and III Wind Power Plants with a total of 26 wind turbines and a capacity of 4.2 MW each, arranged in four wind farms, distributed in the municipalities of Santana do Matos, Lagoa Nova, São Vicente and Tenente Laurentino Cruz, in the state of Rio Grande do Norte.

The installed capacity is 109.2 MW, with enough energy to supply about 580 thousand homes in the average consumption pattern of the Northeast. The construction of the Acauã Wind Complex had an investment of approximately R$ 700 million and generated more than 800 jobs since the beginning of the implementation, a very significant part of which was occupied by residents of Rio Grande do Norte.

The full commercial operation of the Acauã Wind Complex began on July 6, 2024.

Image: Jhonnatas Freire, AFAPLAN, 2023.

Start of operation of the Acauã Wind Complex/RN

cesi_0004_Camada 1

Wind turbines

The wind turbines of the Santo Inácio Wind Complex and the Gravier Wind Power Plant are of the type with a horizontal axis. Its structure is inspired by windmills and wind vanes, chosen by Aliança for having greater efficiency in energy generation than the other alternative, with a vertical axis.

cesi_0002_Camada 3

Nacelle

It is the heaviest structure of the wind turbine, where the rotor and the blades are attached to it. It is located at the top of the tower and receives the main components such as the gearbox, the generator, the chassis and the yaw (responsible for electronic control) and hydraulic systems, in addition to the brakes, clutch and bearings

cesi_0000_Camada 5

Transmission Lines

The energy produced at CESI and Gravier is interconnected to the SIN – National Interconnected System – through CHESF’s substation (SE), Mossoró IV, via a 9 km 230 kV transmission line.

cesi_0003_Camada 2

Tower

The largest component of the wind turbine, responsible for supporting the rotor, nacelle and blades. At the Santo Inácio Wind Complex and at the Gravier Wind Power Plant, the wind turbine towers are built in concrete.

cesi_0001_Camada 4

Paddles

They are responsible for capturing the mechanical energy of the wind, converting its power to the rotor. The structure of the blades is made with materials such as plastic – mainly epoxy and polyester – and fiberglass.

Map of the Acauã Wind Complex

Follow the news from the Acauã Wind Complex

  On November 26, the general DDS was held in Acauã, highlighting Blue November, with …

  On November 26, Aliança’s teams at the Acauã (RN) and CESI (CE) units participated …

  On November 17 and 18, Aliança closely followed two special nights of art, culture …

  On Saturday, November 22, Praça Metódio Fernandes da Costa, in São Vicente (RN), was …