Risoleta Neves Hydroelectric Power Plant
September 7, 2004
140 MW
Generating Units
3 units
Main River Basin
Doce River
400 thousand inhabitants
The Risoleta Neves Hydroelectric Power Plant was inaugurated on September 7, 2004.
The plant is located in the Doce River Basin, closer to the headwaters of this river, which occupies an area of more than 83 thousand km² in the states of Minas Gerais and Espírito Santo.
The project is located between the municipalities of Rio Doce and Santa Cruz do Escalvado, in the Zona da Mata of Minas Gerais and has three generating units with an installed capacity of 140 MW.
The plant was named “Risoleta Neves Hydroelectric Plant” in honor of Risoleta Guimarães Tolentino Neves (1917-2003), wife of the former president of Brazil, Tancredo Neves (1910-1985).
Risoleta Neves Hydroelectric Power Plant Map
Follow the news of the Risoleta Neves Hydroelectric Power Plant
470 kilos of waste
removed from the
coas...
On June 13, Aliança Energia held another edition of the Beach Cleaning Campaign, this time …
Aliança Energia
carries out
awareness an...
During the month of May, Aliança Energia carried out, at the Santo Inácio Wind Complex …
Dialogue and
development mark the
II Mee...
On May 6, Aliança Energia held the II Workshop with Community Leaders, in the municipality …
Aliança
Energia’s
participation st...
On April 5, Aliança Energia participated in the “Dialogue” event, promoted by the Brazilian Association …