Risoleta Neves Hydroelectric Power Plant
September 7, 2004
140 MW
Generating Units
3 units
Main River Basin
Doce River
400 thousand inhabitants
The Risoleta Neves Hydroelectric Power Plant was inaugurated on September 7, 2004.
The plant is located in the Doce River Basin, closer to the headwaters of this river, which occupies an area of more than 83 thousand km² in the states of Minas Gerais and Espírito Santo.
The project is located between the municipalities of Rio Doce and Santa Cruz do Escalvado, in the Zona da Mata of Minas Gerais and has three generating units with an installed capacity of 140 MW.
The plant was named “Risoleta Neves Hydroelectric Plant” in honor of Risoleta Guimarães Tolentino Neves (1917-2003), wife of the former president of Brazil, Tancredo Neves (1910-1985).
Risoleta Neves Hydroelectric Power Plant Map
Follow the news of the Risoleta Neves Hydroelectric Power Plant
Emergency drill
brings together
teams in...
On July 30, Aliança Energia, in partnership with WEG, carried out an emergency drill for …
Opportunity:
Automation
Technology
Supervisor
Check out the opportunity Education Complete Higher Education in Information Technology: Systems Analysis and Development, …
Ecological Drinking
Fountains Project
at...
Recognized with the 2nd place in Aliança Energia’s InoAção Program in 2023, the project “Implementation …
Aliança Energia
participates in the
cele...
Aliança Energia was present at the ceremony in celebration of the three years of operation …