Funil Hydroelectric Power Plant
Funil HPP
Inauguration
December 10, 2002
Installed Power
180 MW
Generating Units
3 UGs
Main River Basin
Rio Grande
Feeding Capacity
Supply of 685 thousand inhabitants
The Engenheiro José Mendes Júnior Hydroelectric Power Plant, popularly known as the Funil Power Plant, was inaugurated on December 10, 2002 and since March 2015 has been part of Aliança Energia’s portfolio of own plants.
It is located in the Rio Grande Basin, in the southern region of Minas Gerais, between the municipalities of Perdões and Lavras. The Funil Plant was built in a record period of 33 months and its first generating unit went into commercial operation 27 months after implementation. The works began in September 2000 and were completed in July 2003, with the delivery of the third generating unit.
The Funil Power Plant has an installed capacity of 180MW with 84.6 MW of average assured energy in operation. This energy would be enough to supply a city of approximately 685 thousand inhabitants.
The plant was the first in Brazil to install the Fish Transposition System (STP) through a complete lifting system. The structure aims to allow the continuity of the migration process of fish species from the Rio Grande. The fish elevator started operating in January 2004 and in 15 years of operation it has transported more than 400 tons of fish.
Come and visit the Funil Hydroelectric Power Plant/MG
Aliança's socio-environmental performance at the Funil HPP/MG
Turbines
The Funil HPP has 3 Kaplan-type turbines, coupled to the three generators with generation capacities of 60MW each, totaling 180MW of installed capacity. This energy is enough to supply a city with about 685 thousand inhabitants.
Spillway
The Funil HPP has 4 regulation gates, which can be activated to control the water level in the reservoir during rainy periods, when there is an increase in the affluent flow. Annually, the floodgates are tested to assess the adequacy of response during opening, they are the so-called Extravasor Tests (check out the video of the tests on our YouTube channel). The structure is designed to withstand decamillenar floods.
Fish Transposition System -STP
The transposition of fish at the Funil HPP is carried out by means of an elevation system, unique in the country, due to the height of the dam.
The System works during the spawning period, from November to February, when the fish go up the river for reproduction. In the STP, monitoring is carried out, which quantifies and qualifies the species. These studies also contribute to the adoption of measures for the protection and conservation of fish species in the region.
Powerhouse
The Power House concentrates the entire operation of the hydroelectric plant. In it, the 4 galleries are located: electrical, mechanical, piping and suction and also the Generating Units for energy production. The powerhouse also houses the control room, from where the systems and equipment that make up the Funil Plant are operated. The Funil HPP is tele-assisted and can also be operated from Cemig’s Operation Center in Belo Horizonte.
Auxiliary Dam
The dam of the Funil Plant is 50m high, from the crest to the base, and is made up of part concrete and rockfill, a mass composed of compacted rock blocks and earth. The structure has dozens of stability monitoring equipment.
Substation
The energy generated at the Funil Plant is taken to a substation, a high-power electrical installation, and from there it goes to the distribution lines. From there, the energy is distributed by the local energy distribution companies.
Funil HPP Map
Follow the news of UHE Funil
2nd monthly test of
the PAE sirens of
th...
Aliança Energia will carry out, on February 4, the second periodic sound test of 2026, …
World Environmental
Education Day –
insp...
Today, January 26th, is celebrated the World Day of Environmental Education. The date aims to …
1st monthly test of
PAE sirens in 2026
t...
The first periodic sound test of 2026 will be held on January 7, with the …
“STOP and
FOLLOW” system
in ...
To the users of the Funil HPP dam road, we inform that traffic on the …