Risoleta Neves Hydroelectric Power Plant
September 7, 2004
140 MW
Generating Units
3 units
Main River Basin
Doce River
400 thousand inhabitants
The Risoleta Neves Hydroelectric Power Plant was inaugurated on September 7, 2004.
The plant is located in the Doce River Basin, closer to the headwaters of this river, which occupies an area of more than 83 thousand km² in the states of Minas Gerais and Espírito Santo.
The project is located between the municipalities of Rio Doce and Santa Cruz do Escalvado, in the Zona da Mata of Minas Gerais and has three generating units with an installed capacity of 140 MW.
The plant was named “Risoleta Neves Hydroelectric Plant” in honor of Risoleta Guimarães Tolentino Neves (1917-2003), wife of the former president of Brazil, Tancredo Neves (1910-1985).

Risoleta Neves Hydroelectric Power Plant Map
Follow the news of the Risoleta Neves Hydroelectric Power Plant
Projects supported
by Aliança Energia
pr...
Aliança Energia values partnerships and meetings that promote genuine social impact. Through the resources …
Aliança Energia
participates in
Security...
On November 26, Aliança’s teams at the Acauã (RN) and CESI (CE) units participated …
Aliança Energia
holds SIPAT 2025 at
CESI...
Between November 11 and 14, the SIPAT 2025 (Internal Week for the Prevention of …
Ecogranja
participates in the
Quinta Cul...
The Ecogranja project, of the Community Association for Sustainable Development of Gravier, took an important …